White
& Frederick Kiln
Warrenton,
Virginia
[This is page two; go to page one]

Almost final form; layer of plastic required

Balls of castable refractory ready for application

Rows of castable meeting at the flue end of the kiln

Rows of castable meeting at the front; overlapping the door

Castable rows coming up the side

Castable sides meeting at the top; buckets for stoke holes

Fiber and junk castable over super-duty castable

Leveling bricks for stacking shelves
[Floor is sloped soil/natural clay with two
inches silica sand]

Casting bricks for the door

Completed Kiln

Completed kiln, side view

Kiln interior

Kiln Shed
["Up-slope" 8 feet of wall section at left is removable]
Back to Page 1 of Construction Photos